CO129-543-10 Water supply- Shing Mun Valley water works 21-4-1933 - 8-2-1934 — Page 8

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All

сь

FeDept.

I have telephoned to Col. Flemming (as I undertook to do) Нений

talinghim that the engagement of Mr. Finlay is Sanchined

/said

an como confirm of letter at cace.

will

you kinda alting to this

8.1.7.?

28433

x 2 % ca. (I and) 29. 4.33.

3 to God. 163 (W)c Nos. 182) #7-3 MAY 1933

m. H. m. Finlay appra. (50320 CR.)

4. Gou.

371

29.6.33.

Twos capies

of

traso resolution

prosed

by her. Tal on 1576 in connection with the shime mum Varrey scheme.

? Cutler

Fal- //31.7.33

31.7 whe

10

Page

Page

9

جھے

Extract from Hansard dated: 15th June, 1933

Putby

12/8/53

لله

14 alua

Gro Corf

14.

7

6-

now nerearmy

second ske ime.

десто

shades trat it

во

Bevorde

Requests

bi

ushed. To obtain

that. For Henderam way

certain informations

techmeal native.

I think there is no doubt that we

should approve the proposal to include $300,000 in the draft Estimates for 1934, under the Loan Works,

Ordinance for the second pipeline across the

harbour. Before informing the Governor,

however, I think we had better write to Mr.

Henderson. We shall then be able to tell

the Governor at the same time whether it has

been possible to make the arrangement which

t he recommends for Mr. Henderson to investigate,

with the assistance of the Crown agents, certain

problems regarding the different types of

material used in the pipes and the methods

adopted for their protection.

I submit a draft s-o letter to Mr.

Henderson.

жиест

17.8.33

age 9

age 9

Page

Page

e 10

10

There is no

doubt

that the

ratu

supply

is one of

thu

most mersing problems of the

14K Gut

that

it cannot

be delayed.

considnable

the

exfunditur

Shing Man

Gallery

dam

would

be wanted

in thoug

The

exha

pepe live

hope the

wata

on to the city.

S..R.19. Haood soso

r

to I Hinduson

Serhant

(7

8

7

8 C.A.

Es in

21.8

24/8/ss

Trs. Copy of

report

Aler. Binne

the visit of

inspection hard by, for Enaley

As a result of Mt Pourley's wait

te 10Page 11

11

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.